Bangalore Metro Section 3 to cowl 42 km, have 31 stations- The New Indian Specific


Specific Information Service

BENGALURU: The alignment of Bengaluru Metro Section-III venture has simply been finalised. The 42-km line will combine with different Metro traces, suburban rail or bus depots at 9 factors that can assist in seamless connectivity, say prime officers. The venture is anticipated to develop into operational by 2027-2028. 

Based on the alignment report readied by the Bangalore Metro Rail Company Ltd, Section-3 could have two Metro corridors. Hall-I’ll run alongside the Outer Ring Highway from J P Nagar to Hebbal for 31 km whereas Hall-II will run from Hosahalli Toll to Kadabagere for 11 km. A senior Metro official mentioned, “The road alongside the ORR could have 22 stations together with three at JP Nagar whereas the second line could have 9 stations. Somanahalli Cross will function an interchange station,” he added.

The primary hall ending at Hebbal will intersect with Section-2B of Airport Line that can run from KR Puram to KIA by way of Hebbal, thereby connecting the ORR Highway absolutely. Metro Section 3 could have just one depot at Sumanahalli Cross.

The essential facet of Metro Section-3 are these 9 factors the place it’s going to merge with its personal community or facilitate multi-modal integration, mentioned one other official. Among the many factors the place it will occur are the JP Nagar Section V station with J P Nagar stn in Inexperienced Line of Section-I; Kamakya Metro with the bus station; Mysuru Highway with current one on Purple Line; Sumanahalli Cross will function an interchange level for each the brand new corridors; Peenya with current station on Inexperienced Line; Lottegahalli will join with the proposed Suburban rail hall; Hebbal with upcoming suburban rail station, current Indian railway station and the BMTC depot, and Hosahalli with the prevailing station on Inexperienced Line.

The visitors survey is but to be carried out and the Detailed Challenge Report is anticipated to be readied by RITES inside six or seven months, one other official mentioned. 

The Hall-1 could have stations at JP Nagar 4th Section (JD Mall), JP Nagar fifth Section, JP Nagar, Kadirenahalli, Kamakhya bus depot, Hosakerahalli Cross, PES Institute of Know-how, Mysore Highway and others.

Stations deliberate

Hall One

JP Nagar IV Section (JD Mall),
JP Nagar V Section,
JP Nagar
Kadirenahalli
Kamakya bus Depot
Hosakerahalli Cross
PES Institute of Know-how
Mysuru Highway
Nagarbhavi Circle
Vinayaka Structure

Ambedkar Institute of Engineering
BDA Advanced
Sumanahalli Cross
Chowdeshwari Nagar
Freedom Fighters Cross
Kranteevera Studio
Peenya
Bahubali Nagar
BEL Circle
Patelappa Structure
Hebbal
Kempapura

Hall Two
Hosahalli
 KHB Colony
Vinayak Nagar
Sumanahalli Cross
Sunkadakatte
Herohalli
Byadarahalli
Forest Gate
Kadabagere



Supply hyperlink