Bullet prepare: Chennai – Bengaluru in beneath 120 minutes? Germany submits report saying bullet prepare is possible


Germany submits report; bullet prepare from Chennai to Mysuru through B’luru ‘possible, manageable’

AA bullet prepare from Chennai to Mysuru through Bengaluru could take simply two hours and 25 minutes as towards the present seven hours in Shatabdi (in pic), which is the quickest on this route. On Thursday, Martin Ney, German Ambassador to India handed over the ultimate feasibility report on the Chennai-Bengaluru-Mysuru bullet prepare to Railway Board Chairman Ashwani Lohani.

“The important thing discovering of the examine is that the high-speed prepare on the route will not be solely possible but additionally manageable,” stated Ney. Lohani stated the report will probably be studied earlier than additional steps are taken over the 435-km excessive velocity rail (bullet prepare) hall. The bullet prepare can attain a most velocity of 320 kilometres per hour.

An official stated out of 435 km, about 84 per cent of the monitor can be elevated whereas 11 per cent will probably be in a tunnel, whereas the remaining will probably be on grade.

Welcoming the proposal, Bhaskar Y, a techie stated, “This may do wonders as 1000’s of individuals journey between the three cities. Whereas the site visitors on Bengaluru-Mysuru stretch is ever-increasing, the prepare journey time between Bengaluru and Chennai is wherever between 5 and 7 hours, forcing many individuals to fly.”

Extra Metro trains to have six coaches

N M Dhoke, director of Rolling inventory, Signalling and Electrical, BMRCL stated, “We’re planning to introduce two six-car prepare units from December onwards, initially on East-West hall and later North-South hall. ‘

In line with the press data bureau (PIB), the Mumbai-Ahmedabad Rail Hall is the one sanctioned Excessive-Pace Rail Mission within the nation as of now and applied with technical and monetary help of Authorities of Japan.

Forms of ultra-high-speed applied sciences

Quadlev: That is ‘attraction’ primarily based Maglev know-how, cheaper in comparison with Maglev.

Hyper Loop: This entails pressurised capsules travelling in a lowered strain tube. Maglev: Quick for magnetic levitation, this makes use of two units of magnets, one to repel the prepare and assist it levitate above tracks and one other to propel it.

Supply: PIB

Mumbai-Ahmedabad
vs
Chennai-B’luru-Mysuru

  • The estimated value of the Mumbai-Ahmedabad challenge has been pegged at `1,08,000 crore. The federal government of Japan has agreed to offer a delicate mortgage of 81 per cent of whole challenge value with 0.1% price of curiosity each year.
  • The size of the hall is 508 km
  • Versus this, the Railway Ministry officers say the estimated value will probably be round about `1 lakh crore (about $16 billion) Bengaluru-Mysuru-Chennai route.
  • The route stretches to 435 km



Supply hyperlink